NATIONAL COMPETITIONS << Return to projects


     New National Hostel Molina de Aragón. Guadalajara 2009
    Between the castle and the hotel there are a comunication. On this comunication, even the architecture, landscape and the history increase the imagination of the citizens. To elude this reality is to give the back to the history
 

  << Download PDF>>


     Especially "Ahijones" Plan. Public Housing 375 and 410. (Winner in  the 375 homes). 2007

    We propose the construction of two types of housing in keeping with the urban conception we propose: blocks of flats and a dual band flexible.
 

  <<Download PDF>>


     Music Palace, Congress and Exhibition of the city of Vitoria -  Gasteiz. Accesit 12008.
    Ambitious proposal for the memory of the city and urban as a reference in the landscape of the immediate environment, creating a system of functional and physical very active for a place expectant of vitoriagasteiz.
 

  << Download PDF>>


     Cultural Center Auditorium in Lugo. 2nd Prize2008
    Our project is object and useful. We understand the citizen like active users. Responding to the problem of architecture as a problem of the construction area. Elude the symbolic value, but also the rhetoric (main facade, axis of access, use hierarchy, scenery, special effects).
 

  << Download PDf>>


     Congress Palace of La Rioja. Accesit2000
    The project aims to be flexible in all conditions. The versatility of distributions is paramount.
 

  << Download PDF>>


     New Citycouncil in Vitoria. Selected 2nd phase2001
    The proposal is meant as an icon of significant urban reference to the social landscape, getting an area multidisciplinary exchange capable of generating flows information and social cohesion.
 

  << Download PDF>>


    Joint Architectural dedicated to San Fermines, Pamplona. Selected 2nd phase1999
    The building is developed by the use of artis, engineers, country man, who all make a functional and cultural scene. We understand that the people who will be walking through this huge bridge (museum) should be consider as users and not as consumers.
 

  << Download PDF>>


     Center for Arts and Culture, "The Eagle" for the Community of  Madrid. Selected. 1994
    The flexibility runs the project, so that structures, vertical circulation, toilets, etc, are arranged so as not to disturb the possibility of distributing the space with as  many possible variables.
 

  << Download PDF>>


     Draft “Abrir Vigo al Mar”, in Vigo. Selected. 1991
    To give back the vigo`s river coast, moving building that blocks this relation and updating the coast urban support.
 

  << Download PDF>>


     Hospitalet Hospital. 2009
    The proposed building is a hospital whose form is constrained by the parameters urban employment, so he takes an irregular shape that has materialized in a band continuous around two ourtyards and a solid end to the east which is the technical block.
 

  << Download PDF>>


    Promotion of 40 public housing in Santiago de Compostela. 2009
    A cluster of houses in four plants. All rooms with sitting area overlooking the landscape of the west (monte pedroso) and engage in the trunk and branches that form the building's vertical circulation in the area of liaison with the building adjoining the street costa nova.
 

  << Download PDF>>


     180 Housing. "Uva de Hortaleza". Madrid. 2009
    By the logic of concentric bands, the last group defines the facade of the building, as we aim at a fringe, not just an architectural enclosure wall.
 

  << Download PDF>>


     Civic Center in Salburúa. Vitoria-Gasteiz. 2009
    Faced with an architecture full of symbolism, that puts the citizen in a passive-contemplative attitude, we focus on architecture as an "object", an architecture to be used before contemplated.
 

  << Download PDF>>


     Civic Center in Zabalgana. Vitoria-Gasteiz. 2009
    The architecture in the service of society should be clear, transparent in its literal sense, but also in its phenomenological sense.
 

  << Download PDF>>


     Palace Conferences and Fairgrounds. Guadalajara. 2009
    We have advanced an interest in taking the leading character of this building in the skyline with respect to the collective memory of the landscape and urban scene.
 

  << Download PDF>>


     Barcelona Library. 2009
    Formally, the building project is progressing in that which is characteristic of our time, an object unequivocally established, avoiding stylistic speeches and researching in a key project, in which the external result is the result of construction, without tricks or elements adjectives.
 

  << Download PDF>>


      <<Go up>> Page 2>>
<< Return to projects


C/Pintor Ribera nº22 CP 28016. Madrid, España.   Tlf: (34)91-4136984    Fax (34) 91-5193602